Installation Steps
Step 1: Turn off all power to the HVAC system before starting to prevent electrical shock.
Step 2: Mount the UEM module securely near the economizer control panel using screws or brackets.
Step 3: Connect the module wiring to the economizer and building control system following the wiring diagram.
Step 4: Ensure all connectors are fully seated and secured to avoid loose connections.
Step 5: Double-check wiring polarity and terminal labeling.
Step 6: Restore power and verify module LEDs indicate normal operation.
Loyalty Program



