Installation Steps
Step 1: Turn off power to the main electrical panel before beginning installation.
Step 2: Mount the control unit securely near the equipment, following the marked orientation.
Step 3: Connect the input wires to the corresponding terminals.
Step 4: Attach the output/control wires to the monitoring system or relay.
Step 5: Verify all connections are tight and properly insulated.
Step 6: Restore power and test the unit to ensure correct voltage detection.
Loyalty Program



