Special Price $189.96 Regular Price $268.95
In stock
SKU
CHG00064
Manufacturer:
Installation Steps
Step 1: Turn off all power and ensure the system is safely de-energized.
Step 2: Position the charger assembly in the designated field location, ensuring proper clearance.
Step 3: Secure the assembly using proper mounting hardware.
Step 4: Connect all electrical and refrigerant lines according to the installation diagram.
Step 5: Check connections for tightness and leaks.
Step 6: Restore power and test the assembly for proper operation.
Loyalty Program



