Facebook Pixel

Trane BLW01401 2-Stage Blower Inducer 3300/2345 RPM 60Hz 115V

Special Price $305.74 Regular Price $440.95
In stock
SKU
BLW01401
Trane BLW01401 2-Stage Blower Inducer features 3300/2345 RPM speed settings, 60Hz frequency, and 115V power rating for managing combustion airflow in heating equipment. Built with a two-stage blower arrangement, the inducer adjusts airflow output to support proper venting, and burner operation during different heating demands. Frequently utilized in furnace assemblies, combustion systems and exhaust management sections associated with HVAC systems, it assists with maintaining proper air movement throughout operating cycles. Positioned within the required inducer housing during servicing, or replacement procedures the blower inducer helps provide accurate airflow control and effective combustion performance.
https://www.partshnc.com/media/catalog/product/b/l/blw01401.jpg
Write Your Own Review
You're reviewing:Trane BLW01401 2-Stage Blower Inducer 3300/2345 RPM 60Hz 115V
Your Rating
Customer Questions
What maintenance is required for the Trane BLW01401 Blower Inducer?

Regularly inspect the blower inducer for dust, debris, or signs of wear. Clean the fan blades and housing, and ensure mounting screws are tight. Proper maintenance prevents vibration and maintains airflow efficiency. Always follow safety guidelines when working near moving parts.

What are common issues with the Trane BLW01401 Blower Inducer?

  • Excessive vibration or rattling.
  • Reduced airflow or weak suction.
  • Motor overheating or tripping.
  • Noisy operation during startup or running.

Installation Steps

Step 1: Turn off all power to the HVAC system at the breaker to ensure safety.

Step 2: Remove the furnace access panel and locate the existing blower inducer.

Step 3: Disconnect wiring and vent pipes connected to the old inducer.

Step 4: Remove mounting screws and carefully take out the old unit.

Step 5: Install the new inducer in the same position, securing screws tightly.

Step 6: Reconnect wiring and vent pipes exactly as before.

Step 7: Replace the access panel and restore power. Test operation to confirm proper function.