Installation Steps
Step 1: Turn off and lock out power to the furnace before starting.
Step 2: Remove the access panel and disconnect the old draft inducer blower, noting wiring and mounting.
Step 3: Detach any ducting or flue connections from the old blower.
Step 4: Mount the new blower securely in place, ensuring proper alignment with the flue and motor shaft.
Step 5: Reconnect all wiring and duct connections.
Step 6: Restore power and run the system to verify smooth operation and proper airflow.
Loyalty Program



