Shipco Pumps SDPS00290 Float Switch NEMA 1
Specifications
- Type: Float Switch
Loyalty ProgramStep 1: Turn off power to the pump or system to prevent electrical shock.
Step 2: Select the mounting location where the float can move freely without obstruction.
Step 3: Mount the float switch using brackets or screws, ensuring it is stable and upright.
Step 4: Connect wiring according to the manufacturer’s diagram, observing proper polarity.
Step 5: Check float movement for smooth operation without interference.
Step 6: Restore power and test the switch for proper pump activation.