Facebook Pixel

Xylem-Bell & Gossett P79027 Shaft Assembly

Special Price $2,631.90 Regular Price $2,921.40
In stock
SKU
P79027
The Xylem-Bell & Gossett P79027 Shaft Assembly is a mechanical drive component built to transfer rotational motion within a compatible pump system. Designed for hydronic HVAC applications, it supports circulation equipment that moves fluid through piping networks serving heating and cooling circuits. The assembly connects motor output to internal rotating elements, providing consistent mechanical alignment and smooth transmission of rotational movement during operation. It is commonly installed as a service replacement part in commercial hydronic pump units to restore proper rotation and maintain steady fluid circulation throughout the system.
Gossett Parts,
Manufacturer:
https://www.partshnc.com/media/catalog/product/p/7/p79027.jpg
Manufacturer Name: Xylem-Bell & Gossett
Product Number: P79027
OEM Part Number: P79027
Product Description: Shaft
Weight:11.2lbs/5080.23g

Choose the best HVAC equipment parts and supplies from PartsHnC!

  • Same Day Shipping

  • Best Quality And Best Price

  • Wide Range of Inventory

  • Best Customer Service

Have More Questions or Need Help to Place The Order?
Reach us at (866)773-0907 or [email protected]

Write Your Own Review
You're reviewing:Xylem-Bell & Gossett P79027 Shaft Assembly
Your Rating
Customer Questions
What maintenance is required for the Xylem-Bell & Gossett P79027 Shaft Assembly?

Inspect the shaft assembly for wear, alignment, and proper lubrication. Ensure all connections are secure and free from corrosion. Monitor for unusual noise or vibration. Routine maintenance supports maintain smooth mechanical operation.

What are common issues with the Xylem-Bell & Gossett P79027 Shaft Assembly?

  • Excessive wear causing imbalance.
  • Misalignment leading to vibration.
  • Noise during operation indicating damage.
  • Lubrication failure increasing friction.
  • Reduced efficiency in system performance.

Installation Steps

Step 1: Turn off power and isolate pump system; relieve pressure and drain fluid.

Step 2: Remove pump coupling guard and disconnect old shaft assembly carefully.

Step 3: Align new shaft assembly with motor and pump couplings.

Step 4: Secure fasteners, ensure proper alignment and rotation carefully.

Step 5: Restore power and test for vibration, leaks, and smooth operation.