Facebook Pixel

International Comfort Products ABG051KAB Scroll Compressor R410A 51,000 BTU 208-230V/1PH

Special Price $1,673.14 Regular Price $1,857.19
Out of stock
SKU
ABG051KAB
The International Comfort Products ABG051KAB Scroll Compressor is an HVAC system designed to be used with R410A refrigerant and has a cooling capacity of 51,000 BTU and uses a single-phase power supply of 208-230V to compress and circulate the refrigerant between the indoor and outdoor coils. The compressor is installed in the outdoor condensing unit and controls the system pressure as well as adds to the total cooling efficiency and performance. It is mostly applied in home and light commercial types of applications where constant temperature control and constant flow of refrigerant are needed.
https://www.partshnc.com/media/catalog/product/a/b/abg051kab.jpg
Write Your Own Review
You're reviewing:International Comfort Products ABG051KAB Scroll Compressor R410A 51,000 BTU 208-230V/1PH
Your Rating
Customer Questions
What maintenance is required for the International Comfort Products ABG051KAB Scroll Compressor?

Regularly inspect the compressor for secure electrical connections and proper mounting. Keep the surrounding area clean from dust and debris. Check refrigerant levels and look for leaks. Always follow safety protocols when handling high-voltage and pressurized systems.

What are common issues with the International Comfort Products ABG051KAB Scroll Compressor?

  • Failure to start or intermittent operation.
  • Overheating under high load conditions.
  • Refrigerant leaks or pressure inconsistencies.
  • Unusual noise or vibration during operation.

Installation Steps

Step 1: Turn off all power to the HVAC system and verify with a voltage tester.

Step 2: Recover any refrigerant in the system according to guidelines before removal.

Step 3: Remove the old compressor carefully, noting all refrigerant and electrical connections.

Step 4: Mount the new scroll compressor securely on the base with proper alignment.

Step 5: Connect refrigerant lines and electrical wiring following the manufacturer’s diagram.

Step 6: Evacuate, charge with refrigerant, and restore power, test operation and check for leaks.