Facebook Pixel

ICP ZP20K6E-PFV-830 Scroll Compressor

Special Price $879.09 Regular Price $1,597.95
In stock
SKU
ZP20K6E-PFV-830
The International Comfort Products ZP20K6E-PFV-830 Scroll Compressor is used to increase the refrigerant pressure and move it to cooling and heat-exchange loops in HVAC systems. It has single-phase power of 208-230V and has a cooling capacity of approximately 20000 BTU with interleaving scroll elements that make the compression smooth and efficient. It is applied in residential and light commercial air conditioners and heat pump units in which a consistent flow of refrigerant is required to facilitate heat exchange. This condenser phases to ensure the refrigerant is able to provide consistent cooling and ensure the operating conditions.
https://www.partshnc.com/media/catalog/product/z/p/zp20k6e-pfv-830.jpg
Write Your Own Review
You're reviewing:ICP ZP20K6E-PFV-830 Scroll Compressor
Your Rating
Customer Questions
What maintenance is required for the ICP ZP20K6E-PFV-830 Scroll Compressor?

Regularly check refrigerant levels and system pressure to ensure optimal performance. Inspect electrical connections and tighten as needed. Clean surrounding areas to prevent debris from entering. Follow safety protocols when handling pressurized components.

What are common issues with the ICP ZP20K6E-PFV-830 Scroll Compressor?

  • Loss of cooling efficiency due to low refrigerant.
  • Unusual vibration or noise.
  • Electrical failures or tripped breakers.
  • Overheating or compressor locking under high load.

Installation Steps

Step 1: Turn off power to the HVAC system and disconnect all electrical connections for safety.

Step 2: Remove panels and refrigerant lines from the old compressor following proper recovery procedures.

Step 3: Disconnect mounting hardware and carefully remove the old compressor.

Step 4: Position the new scroll compressor in the correct orientation.

Step 5: Secure with mounting hardware and reconnect refrigerant lines and electrical wiring per manufacturer guidelines.

Step 6: Evacuate and recharge the system, restore power, and test operation to ensure proper function.