Facebook Pixel

Grundfos 506174 Cartridge Assembly Kit 15-18B 115-230V

Special Price $224.05 Regular Price $248.70
In stock
SKU
506174
The Grundfos 506174 Cartridge Kit 15-18B is a circulator pump that is used to reestablish internal pumping in HVAC systems. It operates by enclosing the rotor and impeller assembly which rotates inside the pump chamber with electrical operation of 115-230 V making the magnetic rotor move the hot water around the circulation loop. The cartridge is installed in compatible circulator pump housings installed on boilers and closed-loop heating units to allow fluid to circulate continuously between supply and return lines to facilitate consistent thermal transfer and ensure balance in the flow conditions needed to achieve uniform heating distribution.
Manufacturer:
https://www.partshnc.com/media/catalog/product/5/0/506174.jpg

Specifications

  • Type: Cartridge Assembly
  • Voltage: 115/230
Write Your Own Review
You're reviewing:Grundfos 506174 Cartridge Assembly Kit 15-18B 115-230V
Your Rating
Customer Questions
What maintenance is required for the Grundfos 506174 Cartridge Assembly Kit?

Regularly inspect the cartridge assembly for leaks, wear, or debris buildup that could affect performance. Ensure proper installation and secure connections to prevent water loss. Clean surrounding components to maintain efficiency. Always disconnect power and relieve system pressure before servicing for safety.

What are common issues with the Grundfos 506174 Cartridge Assembly Kit?

  • Leakage from worn seals or connections.
  • Reduced pump performance or flow issues.
  • Air locking within the system.
  • Unusual noise during operation.
  • Cartridge wear affecting circulation.
  • Improper fit causing operational faults.

Installation Steps

Step 1: Turn off power to the pump and disconnect it from the electrical supply.

Step 2: Close inlet and outlet valves to prevent water flow.

Step 3: Remove the old cartridge carefully using a wrench, avoiding contact with sharp edges.

Step 4: Insert the new cartridge into the pump housing, ensuring proper alignment.

Step 5: Tighten securely but do not over-torque.

Step 6: Open valves, reconnect power, and test for leaks.