Facebook Pixel

Carrier 50HJ441618 Flue Hood Kit

Special Price $49.92 Regular Price $64.90
In stock
SKU
50HJ441618
The Carrier 50HJ441618 Flue hood kit is a essential part of the vented gas-fired furnaces. It works as a cap that sits on the end of the flue pipe, this is the pipe that expels combustion products from your home. The hood also protects the flue pipe termination from rain, snow, debris, and small animals from falling into the system. This goes along way in ensuring that your furnace is safe and runs as it should. It is usually constructed from metal as a result of its strength and ability to withstand the vagaries of the weather.
https://www.partshnc.com/media/catalog/product/5/0/50hj441618.jpg

Specifications

  • Length: 5.5 "
  • Width: 5 "
  • Height: 2.5 "
  • Weight: 0.15lbs
Manufacturer Name: Carrier
Product Number: 50HJ441618
OEM Part Number: 50HJ441618
Product Description: Flue Hood Kit
Weight:0.15lbs/68.04g

Choose the best HVAC equipment parts and supplies from PartsHnC!

  • Same Day Shipping

  • Best Quality And Best Price

  • Wide Range of Inventory

  • Best Customer Service

Have More Questions or Need Help to Place The Order?
Reach us at (866)773-0907 or [email protected]

Write Your Own Review
You're reviewing:Carrier 50HJ441618 Flue Hood Kit
Your Rating
Customer Questions
What maintenance is required for the Carrier 50HJ441618 Flue Hood Kit?

Inspect the flue hood for corrosion, soot accumulation, and any obstruction at the exhaust outlet that could restrict venting. Make sure the hood is firmly secured to prevent wind vibration or loosening over time. Clean the exterior periodically so that debris and ice buildup does not interfere with better flue gas discharge and proper combustion ventilation.

What are common issues with the Carrier 50HJ441618 Flue Hood Kit?

  • Rust formation weakening hood structure.
  • Loose mounting causing rattling in high winds.
  • Blocked outlet restricting flue gas flow.
  • Ice or debris buildup at the hood opening.
  • Warping from longer heat exposure.

Installation Steps

Step 1: Turn off furnace power and gas supply, let unit cool.

Step 2: Remove existing flue cover/hood and clean mounting area.

Step 3: Align new flue hood kit over exhaust outlet.

Step 4: Secure with provided screws, ensure gasket seal is tight.

Step 5: Reconnect and check vent clearance and airflow.

Step 6: Restore power and test operation for proper exhaust.