Facebook Pixel

Trane BAYCNDTRAP2A In-Line Condensate Drain Kit

Special Price $39.93 Regular Price $51.91
In stock
SKU
BAYCNDTRAP2A
The Trane BAYCNDTRAP2A In-Line Condensate Drain Kit is an element of the system that is aimed at controlling the process of condensate elimination in HVAC systems. It has the main role of directing the condensate collected by the unit to the drainage system and avoiding infiltration of air and ensuring that the pressure remains balanced. It consists of piping and fittings that are designed to form an efficient trap so that there is a constant flow with minimum blockages. It can be used to connect the components in line with the condensate path as per unit specifications.
Manufacturer:
https://www.partshnc.com/media/catalog/product/b/a/baycndtrap2a.png
Manufacturer Name: Trane
Product Number: BAYCNDTRAP2A
OEM Part Number: BAYCNDTRAP2A
Product Description: In-Line Condensate Drain Kit
Weight:0.54lbs/244.94g

Choose the best HVAC equipment parts and supplies from PartsHnC!

  • Same Day Shipping

  • Best Quality And Best Price

  • Wide Range of Inventory

  • Best Customer Service

Have More Questions or Need Help to Place The Order?
Reach us at (866)773-0907 or [email protected]

Write Your Own Review
You're reviewing:Trane BAYCNDTRAP2A In-Line Condensate Drain Kit
Your Rating
Customer Questions
What maintenance is required for the Trane BAYCNDTRAP2A Condensate Drain Kit?

Inspect the drain trap and lines regularly for clogs, debris, or buildup that could block proper condensate flow. Clean components as needed to prevent water backup and potential system damage. Ensure secure fittings and check for leaks, always turning off the system before servicing for safety.

What are common issues with the Trane BAYCNDTRAP2A Condensate Drain Kit?

  • Clogged or slow drainage.
  • Leaks at connections or seals.
  • Improper installation causing water backup.
  • Cracks or damage to tubing or trap.

Installation Steps

Step1: Turn off HVAC power and water supply before starting.

Step2: Position the drain kit inline with the condensate line and dry-fit connections.

Step3: Secure fittings tightly and ensure proper slope for drainage.

Step4: Seal joints to prevent leaks and test by running the system briefly.

Step5: Check for leaks and restore power once installation is verified.