Facebook Pixel

Asco CONTROLS 8044A004CSA 2-Way Gas Solenoid Shutoff Valve M/R 1-1/2" NPT N/C 120/60V 110/50VAC

Special Price $2,354.85 Regular Price $2,613.89
In stock
SKU
8044A004CSA
ASCO CONTROLS 8044A004CSA functions as a 2-way gas solenoid shutoff valve which operates under 120/60 or 110/50 Vac power to shut off gas flow in furnaces and boilers. This device runs on 120/60 or 110/50 Vac while providing a 1-1/2 NPT connector with a manual reset handle. The valve stops gas during de-energized states to safety. The valve functions to stop uncontrolled gas leaks but needs a manual reset after a power outage or shutdown. The ASCO CONTROLS 8044A004CSA valve provides three essential advantages by ensuring safety while controlling gas flow and stopping hazardous gas accumulation in HVAC systems.
Manufacturer:
https://www.partshnc.com/media/catalog/product/8/0/8044a004csa.jpg
Write Your Own Review
You're reviewing:Asco CONTROLS 8044A004CSA 2-Way Gas Solenoid Shutoff Valve M/R 1-1/2" NPT N/C 120/60V 110/50VAC
Your Rating
Customer Questions
What maintenance is required for the Asco CONTROLS 8044A004CSA Shutoff Valve?

Regularly inspect the valve for leaks, corrosion, and proper electrical operation. Clean debris from the valve seat and ensure wiring connections are secure. Proper maintenance ensures reliable gas flow control and prevents operational hazards. Follow all safety protocols when handling gas systems.

What are common issues with the Asco CONTROLS 8044A004CSA Shutoff Valve?

  • Valve failing to open or close fully.
  • Electrical coil burnout.
  • Leaks around the valve seat.
  • Intermittent operation due to debris or corrosion.

Installation Steps

Step 1: Turn off the gas supply and disconnect power to ensure safety.

Step 2: Remove the existing valve from the gas line, carefully disconnecting connections.

Step 3: Inspect and clean pipe threads and fittings for debris or damage.

Step 4: Install the new valve, ensuring correct flow direction and proper alignment.

Step 5: Tighten fittings securely and reconnect electrical wiring according to voltage specifications.

Step 6: Restore gas and power, check for leaks, and test proper operation.