Facebook Pixel

Velocity Boiler Works (Crown) 961122 Rollout Switch 240C/464F

Special Price $40.96 Regular Price $53.25
In stock
SKU
961122
The Velocity Boiler Works (Crown) 961122 Rollout Switch is a safety part for use in gas fired HVAC system equipment or boilers. The rated temperature of this rollout switch is 240°C-464°F and is an essential safety component that shuts down the burner if flames or excessive heat escape the combustion chamber to prevent potential damage. It is a Rollout Switch that monitors heat levels and stops unsafe conditions for operational safety. The system benefits are a durable overheating protection, improved system safety and extended equipment life through prevention of damage from flame rollout.
https://www.partshnc.com/media/catalog/product/9/6/961122.jpg

Specifications

  • Type: Rollout Switch
  • Rating: 240°C/464°F
Manufacturer Name: Velocity Boiler Works (Crown)
Product Number: 961122
OEM Part Number: 961122
Product Description: Rollout Switch 240C/464F
Weight:0.07lbs/31.75g

Choose the best HVAC equipment parts and supplies from PartsHnC!

  • Same Day Shipping

  • Best Quality And Best Price

  • Wide Range of Inventory

  • Best Customer Service

Have More Questions or Need Help to Place The Order?
Reach us at (866)773-0907 or [email protected]

Write Your Own Review
You're reviewing:Velocity Boiler Works (Crown) 961122 Rollout Switch 240C/464F
Your Rating
Customer Questions
What maintenance is required for the Velocity Boiler Works (Crown) 961122 Rollout Switch?

Inspect the rollout switch periodically for heat damage, corrosion, or loose wiring to ensure accurate operation. Keep surrounding burner area clean and free of debris. ensures safe flame containment and prevents hazardous boiler shutdown conditions.

What are common issues with the Velocity Boiler Works (Crown) 961122 Rollout Switch?

  • Loose or damaged wiring causing intermittent shutdowns.
  • Switch failing to reset after activation.
  • Contact corrosion leading to unaccurate electrical continuity.

Installation Steps

Step 1: Turn off all electrical power and gas supply, and allow boiler to cool completely before servicing.

Step 2: Remove burner access panel to locate existing rollout switch near the burner vestibule.

Step 3: Label and disconnect wiring from the old switch carefully.

Step 4: Mount the new switch in the same position, ensuring firm contact with bracket/heat area.

Step 5: Reconnect wires securely and reinstall access panel.

Step 6: Restore power and gas, then test system while monitoring for proper ignition and safety shutdown.