First Company 940-3-CV Flow Control Pump Module
Specifications
- Type: Pump Module
Loyalty ProgramStep1: Turn off power and shut off water supply before installation.
Step2: Remove the existing pump module and disconnect all electrical and plumbing connections.
Step3: Mount the new pump module securely and reconnect piping with proper seals.
Step4: Wire the module to the control circuit following the diagram and tighten all connections.
Step5: Restore power and water supply, then test for leaks and proper pump operation.