NTI Boiler 6008320401 Gas Valve CVI Kit
Specifications
- Type: Gas Valve CVI Kit
Loyalty ProgramStep 1: Turn off gas and electrical power, wait for system to cool.
Step 2: Shut gas isolation valve and relieve line pressure.
Step 3: Remove existing gas valve assembly carefully, noting wiring and piping connections.
Step 4: Install new kit, ensuring correct orientation and tight fittings.
Step 5: Reconnect wiring and gas lines; check all seals.
Step 6: Restore gas slowly and perform leak test with approved solution; then test ignition and operation.