Velocity Boiler Works (Crown) 450608 Low Water Cut Off Valve
Specifications
- Type: Low Water Cut Off
Loyalty ProgramStep1: Turn off power and shut off water supply before starting.
Step2: Drain boiler to below installation point to prevent leaks.
Step3: Remove old cut-off valve and clean piping threads.
Step4: Apply sealant and install the new valve in correct orientation.
Step5: Restore water supply, refill, purge air, and restore power.
Step6: Test operation and follow boiler safety precautions.