Facebook Pixel

Velocity Boiler Works (Crown) 42-502A CWD Control Board CB502-S1-2

Special Price $233.48 Regular Price $259.17
In stock
SKU
42-502A
The Velocity Boiler Works (Crown) 42-502A CWD Control is a high-performance control device for hydronic heating. This compact unit is designed to run at 240V and 60Hz. The CWD control is responsible for controlling the operation of boiler systems in terms of water temperature and achieves the highest level of efficiency. Its mode of operation is to constantly check on system conditions and then work on the burner’s function to improve overall fuel consumption and energy expenses. The effectiveness of this control is most valuable in residential and commercial hydronic systems, mostly hot water boilers and radiators.
https://www.partshnc.com/media/catalog/product/4/2/42-502a.jpg

Specifications

  • Type: CWD Control
  • Voltage: 240V
  • Frequency: 50Hz
  • Weight: 0.47 Lbs
Manufacturer Name: Velocity Boiler Works (Crown)
Product Number: 42-502A
OEM Part Number: 42-502A
Product Description: Cwd Control (Cb502-S1-2)
Weight:0.47lbs/213.19g

Choose the best HVAC equipment parts and supplies from PartsHnC!

  • Same Day Shipping

  • Best Quality And Best Price

  • Wide Range of Inventory

  • Best Customer Service

Have More Questions or Need Help to Place The Order?
Reach us at (866)773-0907 or [email protected]

Write Your Own Review
You're reviewing:Velocity Boiler Works (Crown) 42-502A CWD Control Board CB502-S1-2
Your Rating
Customer Questions
What maintenance is required for the Velocity Boiler Works (Crown) 42-502A Control Board?

Regularly inspect the control board for dust, corrosion, or loose wiring connections. Ensure proper voltage supply and protect it from moisture or overheating. Keeping the surrounding area clean supports prevent electrical faults. Always disconnect power before handling to avoid electrical hazards.

What are common issues with the Velocity Boiler Works (Crown) 42-502A Control Board?

  • Failure to initiate boiler startup cycles.
  • Intermittent or unresponsive control signals.
  • Error codes or diagnostic light malfunctions.
  • Burnt components or visible board damage.
  • Communication issues with connected boiler systems

Installation Steps

Step 1: Turn off power and shut down boiler completely to secure electrical shock or damage.

Step 2: Open boiler control compartment and carefully label all wiring connections.

Step 3: Remove old control board, handling components to avoid static discharge.

Step 4: Mount the new board securely in the same position.

Step 5: Reconnect all wires exactly as labeled, ensuring tight terminal connections.

Step 6: Restore power and test boiler operation, checking safety controls and ignition sequence.