Facebook Pixel

Barnes & Jones 3875 3/4" NPT Vacuum Breaker 125 PSI

Special Price $89.71 Regular Price $103.16
In stock
SKU
3875
The Barnes & Jones 3875 Vacuum Breaker is a mechanical backflow prevention component that has a 3/4 inch NPT connection with a rating of 125 PSI in HVAC systems. It permits the flow of air into a pressurized line when a siphon condition is created so that contaminated water is not pulled back into the potable water supply. This vacuum breaker is installed in the plumbing, boiler, or hydronic heating systems in low points or around equipment drain points to protect the integrity of the systems.
https://www.partshnc.com/media/catalog/product/3/8/3875.jpg
Manufacturer Name: Barnes & Jones
Product Number: 3875
OEM Part Number: 3875
Product Description: 3/4" Vacuum Breaker For Steam 125 Psi Max
Weight:1lbs/453.59g

Choose the best HVAC equipment parts and supplies from PartsHnC!

  • Same Day Shipping

  • Best Quality And Best Price

  • Wide Range of Inventory

  • Best Customer Service

Have More Questions or Need Help to Place The Order?
Reach us at (866)773-0907 or [email protected]

Write Your Own Review
You're reviewing:Barnes & Jones 3875 3/4" NPT Vacuum Breaker 125 PSI
Your Rating
Customer Questions
What maintenance is required for the Barnes & Jones 3875 Vacuum Breaker?

Regularly inspect the vacuum breaker for leaks, corrosion, or debris buildup. Test operation to ensure proper pressure relief and seating. Clean internal components carefully and replace worn seals to maintain safe and effective performance.

What are common issues with the Barnes & Jones 3875 Vacuum Breaker?

  • Leaking or dripping at the connection.
  • Failure to relieve vacuum properly.
  • Corrosion or mineral buildup.
  • Sticking or worn internal seals.

Installation Steps

Step 1: Turn off the water supply before installation for safety.

Step 2: Remove any existing vacuum breaker from the system.

Step 3: Apply thread sealant or Teflon tape to the threads.

Step 4: Screw the vacuum breaker into place securely.

Step 5: Ensure it is upright and properly aligned for correct operation.

Step 6: Turn on the water supply and check for leaks.