Facebook Pixel

Fulton Boiler 2-20-000023 Low Water Probe

Special Price $99.50 Regular Price $114.42
In stock
SKU
2-20-000023
The Fulton Boiler 2-20-000023 Low Water Probe is a safety device employed in hydronic heating systems, or hot water boilers. It is located right inside the boiler’s water chamber and serves as a sentinel against low water level conditions that is crucial. The probe constantly checks the water level, and if it goes below a safe level, an automatic switch is pulled to shut off the boiler burner. This is essential safety which protects the boiler from overheating so that it does not cause major harm or system breakdown.
Manufacturer:
https://www.partshnc.com/media/catalog/product/2/-/2-20-000023_fulton-boiler_partshnc.jpg

Specifications

  • Weight: 0.18lbs
  • Type: Low Water Probe
Manufacturer Name: Fulton Boiler
Product Number: 2-20-000023
OEM Part Number: 2-20-000023
Product Description: Low Water Probe
Weight:0.18lbs/81.65g

Choose the best HVAC equipment parts and supplies from PartsHnC!

  • Same Day Shipping

  • Best Quality And Best Price

  • Wide Range of Inventory

  • Best Customer Service

Have More Questions or Need Help to Place The Order?
Reach us at (866)773-0907 or [email protected]

Write Your Own Review
You're reviewing:Fulton Boiler 2-20-000023 Low Water Probe
Your Rating
Customer Questions
What maintenance is required for the Fulton Boiler 2-20-000023 Low Water Probe?

Clean and inspect the probe regularly to remove scale and mineral buildup that can affect conductivity. Verify wiring connections are tight and corrosion-free. Routine checks ensure accurate low-water cutoff performance and prevent unsafe operation conditions.

What are common issues with the Fulton Boiler 2-20-000023 Low Water Probe?

  • Scale buildup causing inaccurate readings.
  • False low-water alarms triggering shutdowns.
  • No alarm due to probe fouling or insulation.
  • Corroded or loose electrical connections.

Installation Steps

Step 1: Turn off boiler power and allow unit to cool completely.

Step 2: Shut off water supply and relieve system pressure.

Step 3: Remove access plug to reach probe mounting location inside water chamber.

Step 4: Unscrew and carefully extract old probe without damaging threads.

Step 5: Clean probe well to remove scale or deposits.

Step 6: Install new low water probe, ensuring correct seating and seal.

Step 7: Reconnect wiring and secure all fittings.

Step 8: Restore power and water, then test boiler safety cutoff operation.