Step 1: Turn off power to the HVAC system and confirm complete electrical isolation before servicing.
Step 2: Remove the access panel and locate the existing limit switch on the airflow path.
Step 3: Disconnect wiring terminals and carefully remove the old switch from its mounting position.
Step 4: Install the new switch in the same orientation, ensuring proper airflow sensing alignment.
Step 5: Reconnect wiring securely to the correct terminals and verify tight connections.
Step 6: Restore power and test for proper operation.