Facebook Pixel

Burnham Boiler 110101-01 Blower Inlet Shroud Assembly

Special Price $322.57 Regular Price $358.06
In stock
SKU
110101-01
The Burnham Boiler 110101-01 is a Blower-Inlet Shroud Assembly uniquely for boilers to enhance the heating system performance and longevity. This assembly is to regulate the airflow into the blower unit of the boiler to provide perfect combustion conditions. It is constructed from high quality stainless steel This shroud assembly is for both AC systems and operates in the 200–250°F temperature range it is crucial for maintaining sufficient combustion air This assembly ensures combustion conditions by controlling the airflow into the boiler's blower unit. This shroud assembly, which is compatible with both AC systems and functions in is to preserving adequate combustion air.
https://www.partshnc.com/media/catalog/product/1/1/110101-01_BurnhamBoiler_PartsHNC_1.jpg

Specifications

  • Type: Blower Inlet Shroud Assembly
  • Compatibility: Burnham Boilers
  • Material: Stainless Steel
  • Temperature: 200-250°F
  • Voltage: 120-240V AC
  • Weight: 2.31lbs
Manufacturer Name: Burnham Boiler
Product Number: 110101-01
OEM Part Number: 110101-01
Product Description: Blower Inlet Shroud Assy
Weight:2.31lbs/1047.8g

Choose the best HVAC equipment parts and supplies from PartsHnC!

  • Same Day Shipping

  • Best Quality And Best Price

  • Wide Range of Inventory

  • Best Customer Service

Have More Questions or Need Help to Place The Order?
Reach us at (866)773-0907 or [email protected]

Write Your Own Review
You're reviewing:Burnham Boiler 110101-01 Blower Inlet Shroud Assembly
Your Rating
Customer Questions
What maintenance is required for the Burnham Boiler 110101-01 Blower Inlet Shroud Assembly?

Inspect and clean the blower inlet shroud regularly to remove dust and debris buildup. Ensure mounting hardware is tight and free from corrosion. Verify proper airflow alignment during boiler servicing and check for unusual vibration or noise.

What are common issues with the Burnham Boiler 110101-01 Blower Inlet Shroud Assembly?

  • Airflow restriction from dust or debris buildup.
  • Misalignment causing vibration or reduced efficiency.
  • Corrosion or rust affecting structural integrity.
  • Loose mounting hardware leading to noise or unstable operation performance issues.

Installation Steps

Step 1: Turn off boiler power and gas supply; allow unit to cool completely.

Step 2: Remove access panel and disconnect blower assembly wiring carefully, labeling connections.

Step 3: Detach old inlet shroud and clean mounting area of debris.

Step 4: Align and secure new shroud using original fasteners; ensure proper fit and sealing.

Step 5: Reconnect wiring, restore power, and test operation for abnormal noise or airflow issues.

Step 6: Wear protective gloves and verify all seals before restarting.