Facebook Pixel

Burnham Boiler 109706-01 NG To LP Conversion Kit 0-2000FT

Special Price $230.96 Regular Price $256.37
Out of stock
SKU
109706-01
Burnham Boiler 109706-01 NAT to LP Conversion Kit is a conversion kit that is used to enable natural gas boilers to be used on liquefied propane (LP) gas making it flexible to other fuel types. Made of brass this kit is designed to provide maximum performance and durability. It works on a 24 volts power supply with 50 Hz frequency making it ideal for use in most HVAC systems. With this conversion kit, homeowners can have flexibility in the fuel type they use meaning they can save on costs while heating their homes efficiently.
https://www.partshnc.com/media/catalog/product/1/0/109706-01_burnham-boiler_partshnc.jpg

Specifications

  • Type Of Gas: Natural Gas
  • MAterial: Brass
  • Voltage: 24V
  • Frequency: 50HZ
  • Voltage
  • 24V
  • Weight: 2.87 Lbs
Manufacturer Name: Burnham Boiler
Product Number: 109706-01
OEM Part Number: 109706-01
Product Description: Nat To Lp Conv Kit 0-2000Ft
Weight:2.87lbs/1301.81g

Choose the best HVAC equipment parts and supplies from PartsHnC!

  • Same Day Shipping

  • Best Quality And Best Price

  • Wide Range of Inventory

  • Best Customer Service

Have More Questions or Need Help to Place The Order?
Reach us at (866)773-0907 or [email protected]

Write Your Own Review
You're reviewing:Burnham Boiler 109706-01 NG To LP Conversion Kit 0-2000FT
Your Rating
Customer Questions
What maintenance is required for the Burnham Boiler 109706-01 Conversion Kit?

Inspect the kit components regularly for signs of wear, corrosion, or loose fittings. Ensure connections are secure and free of debris. Proper maintenance provides safe fuel conversion and consistent system performance.

What are common issues with the Burnham Boiler 109706-01 Conversion Kit?

  • Gas leaks at connection points.
  • Improper conversion causing combustion issues.
  • Faulty regulators or fittings.
  • Pressure inconsistencies leading to uneven heating.

Installation Steps

Step 1: Turn off gas and electrical supply, shut off main valve and allow appliance to cool.

Step 2: Remove burner access panel and existing natural gas orifice components carefully.

Step 3: Install orifice and regulator components from kit per manual specifications.

Step 4: Adjust gas valve settings for conversion, ensure correct pressure.

Step 5: Reassemble, restore power, check for leaks using soapy water.