Loyalty ProgramPRODUCT OVERVIEW:
Adapts the existing configuration of compatible Burnham boiler equipment for a designated field application. The Burnham Boiler 106459-01 Field Conversion Kit is an OEM kit containing components specified for the manufacturer's approved conversion requirements.
CONVERSION PROCEDURE:
Provides the components needed to modify the boiler's existing configuration for the designated conversion. Each included part serves a specific role in achieving the required equipment setup outlined in the manufacturer's conversion documentation.
INSTALLATION ARRANGEMENT:
Establishes the required physical and connection interfaces for the conversion components within the boiler. Correct component placement and connection alignment help maintain the intended configuration after the modification is completed.
REPLACEMENT GUIDELINES:
Use the Burnham Boiler 106459-01 Field Conversion Kit when the boiler requires the specific manufacturer-approved conversion. Confirm the required conversion type and verify that all kit components are present and undamaged. Have a qualified boiler technician perform the conversion according to Burnham's instructions and verify safe equipment operation.
COMMON FAILURE SYMPTOMS:
EQUIPMENT COMPATIBILITY:
The Burnham Boiler 106459-01 Field Conversion Kit is an OEM replacement kit intended for compatible Burnham boiler equipment requiring the corresponding field conversion. Verify the complete boiler model, required conversion type, and existing equipment configuration against manufacturer parts information before ordering. Confirm the kit contents and applicable installation instructions before beginning the conversion.
TECHNICAL SPECIFICATIONS:
Brand: Burnham Boiler
Part Number: 106459-01
Product Type: Field Conversion Kit
Step1: Turn off power and fuel supply to the boiler before starting.
Step2: Refer to the boiler’s service manual for specific conversion instructions.
Step3: Remove components being replaced and label all wiring and parts.
Step4: Install conversion kit parts per manufacturer directions, securing hardware firmly.
Step5: Reconnect wiring and verify set‑ups match conversion requirements.