Facebook Pixel

Lochinvar & A.O. Smith 100135332 Burner Assembly For PF Unit

Special Price $3,048.29 Regular Price $3,383.60
Out of stock
SKU
100135332
The Lochinvar & A.O. Smith 100135332 is Burner Assembly an essential part for the PF units of commercial HVAC systems. This assembly helps in combustion so as to produce heat to warm water or air in the most efficient way. Its design is highly developed to provide increased dependability and efficiency, low time out and service requirements. It helps to save on electricity bills and yet provide a constant heat output which is very important. Perfect for water heater and boiler applications, this burner assembly is safe and durable, perfect for any HVAC system.
https://www.partshnc.com/media/catalog/product/1/0/100135332_lochinvar--a.o.-smith_partshnc.jpg

Specifications

  • Type: Burner Assembly
  • For Use With: Power-Fin Unit
Manufacturer Name: Lochinvar & A.O. Smith
Product Number: 100135332
OEM Part Number: 100135332
Product Description: Burner Assembly For Pf Unit
Weight:17.5lbs/7937.86g

Choose the best HVAC equipment parts and supplies from PartsHnC!

  • Same Day Shipping

  • Best Quality And Best Price

  • Wide Range of Inventory

  • Best Customer Service

Have More Questions or Need Help to Place The Order?
Reach us at (866)773-0907 or [email protected]

Write Your Own Review
You're reviewing:Lochinvar & A.O. Smith 100135332 Burner Assembly For PF Unit
Your Rating
Customer Questions
What maintenance is required for the Lochinvar & A.O. Smith 100135332 Burner Assembly?

Inspect and clean burner ports regularly to remove carbon buildup and debris. Ensure gas connections are tight and check ignition performance for consistent operation. Regular servicing improves efficiency and reduces safety risks from incomplete combustion or gas leaks.

What are common issues with the Lochinvar & A.O. Smith 100135332 Burner Assembly?

  • Carbon buildup causing uneven flame.
  • Ignition failure or delayed startup.
  • Clogged burner ports reducing efficiency.
  • Gas flow inconsistencies or pressure-related shutdowns.
  • Soot accumulation affecting combustion stability.
  • Partial blockage leading to reduced heat output.

Installation Steps

Step 1: Shut off gas and power, apply lockout/tagout, and confirm system is cool and depressurized.

Step 2: Remove access panel and carefully detach old burner assembly.

Step 3: Install new burner assembly, ensuring proper seating and alignment in the combustion chamber.

Step 4: Reconnect gas lines and electrical igniters per factory schematic.

Step 5: Check all fittings for leaks using approved leak detection solution.

Step 6: Restore power and gas supply slowly.

Step 7: Test ignition cycle and check stable flame operation and proper combustion safety controls.