Facebook Pixel

Lochinvar & A.O. Smith 100112275 14" Liquid Propane Burner Assembly #52 Orfice

Special Price $172.52 Regular Price $198.39
In stock
SKU
100112275
The Lochinvar & A.O. Smith 100112275 is an LP 14" Burner Assembly with Orifices-52 which is a replacement part for select water heaters and is of high quality. This burner assembly makes it possible to easily combust liquid propane gas and to distribute this combustion heat evenly throughout the entire water heater unit. It is compatible with Lochinvar and A.O. Smith water heaters and helps keep water temperatures consistent as well as overall energy efficient. The 52-orifice size provides precise gas flow and safe, efficient operation. Replacing a worn or faulty burner assembly in the water heater extends the water heater’s life, increases its performance, and decreases its energy cost. For keeping high efficiency in HVAC systems.
https://www.partshnc.com/media/catalog/product/1/0/100112275_lochinvar--a.o.-smith_partshnc.jpg

Specifications

  • Type: Liquid Propane Burner Assembly
  • Size: 14"
  • Orifice: #52

PRODUCT OVERVIEW:
Supports liquid propane combustion by delivering fuel to the burner head for ignition and heat generation. The Lochinvar & A.O. Smith 100112275 14" Liquid Propane Burner Assembly features a 14-inch burner configuration with a #52 orifice for its designated propane-fired water heater application. The assembly brings together the burner head, manifold components, pilot assembly, thermopile, and thermal switch to support fuel delivery, ignition, and associated burner-control operations within the water heater.

PROPANE FUEL DELIVERY:
Directs liquid propane from the manifold assembly to the burner head for combustion. The fuel delivery arrangement guides propane through the burner orifice and distributes it to the burner area for ignition. This process supports the controlled supply of fuel required by the water heater's combustion system. Proper fuel delivery allows the burner assembly to perform its intended heating operation.

IGNITION AND FLAME SENSING:
Supports burner ignition and flame-related control through the integrated pilot and thermopile components. The pilot assembly provides the ignition point for the burner, while the thermopile supplies an electrical signal associated with the pilot flame. The thermal switch also forms part of the assembly's temperature-related safety arrangement. Together, these components support the ignition and control activities required during water heater operation.

REPLACEMENT GUIDELINES:
Replace the Lochinvar & A.O. Smith 100112275 14" Liquid Propane Burner Assembly #52 Orifice when burner damage, restricted fuel delivery, or failure of the included pilot, thermopile, or thermal switch affects proper combustion and ignition. A defective assembly can cause ignition problems, pilot flame failure, or interrupted water heater operation. A qualified gas appliance technician is required to install the replacement, inspect gas connections, and verify safe ignition and combustion.

COMMON FAILURE SYMPTOMS:

  • The burner does not ignite correctly during the normal startup sequence.
  • The pilot flame does not remain established after the ignition process.
  • The burner head or manifold assembly shows physical damage.
  • The thermopile or thermal switch fails diagnostic testing.
  • The burner orifice or fuel passage requires replacement due to confirmed obstruction or damage.

EQUIPMENT COMPATIBILITY:
The Lochinvar & A.O. Smith 100112275 is an OEM liquid propane burner assembly designed for compatible residential water heaters. Before ordering, verify the complete water heater model and serial number, liquid propane configuration, and original burner assembly details against the manufacturer's parts documentation.

TECHNICAL SPECIFICATIONS:
Brand: Lochinvar & A.O. Smith
Part Number: 100112275
Product Type: Liquid Propane Burner Assembly
Burner Length: 14 inches
Orifice Size: #52

Write Your Own Review
You're reviewing:Lochinvar & A.O. Smith 100112275 14" Liquid Propane Burner Assembly #52 Orfice
Your Rating
Customer Questions
What maintenance is required for the Lochinvar & A.O. Smith 100112275 Liquid Propane Burner Assembly?

Regularly clean the burner to remove soot, debris, and residue from propane combustion. Inspect igniters and electrodes for proper alignment and wear. Check gas connections for leaks and ensure proper airflow. Always turn off power and fuel supply before maintenance.

What are common issues with the Lochinvar & A.O. Smith 100112275 Liquid Propane Burner Assembly?

  • Flame instability or uneven burning.
  • Ignition failure or delayed ignition.
  • Gas leaks around connections.
  • Blocked or corroded burner ports.

What is the function of the Lochinvar & A.O. Smith 100112275 Liquid Propane Burner Assembly?

The 100112275 delivers liquid propane to the burner head to support ignition and heat generation in compatible residential water heaters.

How do the pilot assembly and thermopile contribute to burner operation?

The pilot assembly provides the ignition point, while the thermopile generates an electrical signal associated with the pilot flame. These components support the burner's ignition and flame-related control functions.

What maintenance does the 100112275 burner assembly require?

Have a qualified technician inspect the burner head, orifice, pilot assembly, thermopile, and gas connections during scheduled water heater servicing.

Why is the liquid propane fuel configuration important for the 100112275 burner assembly?

This burner assembly is designed for liquid propane operation. Confirm the water heater's fuel configuration before ordering to ensure the replacement matches the appliance's specified fuel type.

What should I verify before ordering the 100112275?

Confirm the water heater model and serial number, liquid propane fuel configuration, 14-inch burner length, and #52 orifice against the manufacturer's parts documentation.

Installation Steps

Step1: Turn off gas and power supply before servicing.

Step2: Remove the old burner assembly and clean the mounting area.

Step3: Position the new burner assembly and secure it with hardware.

Step4: Reconnect gas lines and verify tight, leak-free fittings.

Step5: Restore power and test ignition for proper operation.